The company’s patented EZ-KEY™ system replaces traditional cast-in-place methods with modular precast sections, a shift intended to accelerate installation timelines and reduce field labor requirements. By establishing localized production hubs, Roman Stone aims to mitigate common freight logistics challenges while maintaining consistent quality standards across complex energy and transportation developments.
Roman Stone Launches Texas Infrastructure Project via Mobile Units
Following a successful rollout in Ohio, Roman Stone has deployed its Mobile Infrastructure division to Texas to begin work on a major EZ-KEY™ Precast Duct Bank project. The move signals an aggressive national expansion strategy designed to bring factory-controlled production directly to active utility and data center job sites.

CEO Daniel Murray noted that the transition from Ohio to Texas highlights the operational flexibility required to meet rising domestic infrastructure investment demands. As projects for utility and data center sectors increase in complexity, the ability to manufacture components near the point of installation provides contractors with a significant advantage in schedule management and cost control.



Comments (0)
No comments yet. Be the first!