Located at 515 Pioneer Drive, the development consists of three five-story buildings spanning 2.79 acres. The community reserves 92 units for low-income seniors and 245 for families, with eligibility set for households earning between 30% and 80% of the area median income. Construction on the site began in January 2023, with residents moving in throughout the summer of 2026.
The project emphasizes intergenerational living, featuring shared courtyards, a pedestrian paseo connected to Fremont Park, and over 5,800 square feet of community space. Designed to LEED Gold standards, the apartments are fully electric and include amenities such as a gym, computer labs, and community gardens. According to Linc Housing and National CORE, the development serves as a model for using large-scale construction to maximize land and infrastructure efficiency.




Comments (0)
No comments yet. Be the first!